Wojciech Bożejko
- Solving Resource-constrained Construction Scheduling Problems With Overlaps By Metaheuristic. Dans: Journal of Civil Engineering and Management, v. 20, n. 5 (octobre 2014). (2014):
- Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling. Dans: Automation in Construction, v. 18, n. 1 (décembre 2008). (2008):