0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. He, Chuanni / Yu, Bei / Liu, Min / Guo, Lu / Tian, Li / Huang, Jianfeng (2024): Utilizing Large Language Models to Illustrate Constraints for Construction Planning. In: Buildings, v. 14, n. 8 (23 July 2024).

    https://doi.org/10.3390/buildings14082511

  2. Javanmardi, Ashtad / Liu, Min / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, Alireza (2024): Improving Construction Meeting Effectiveness: Trade-Offs between Reactive and Proactive Site-Level Planning Discussions. In: Journal of Management in Engineering (ASCE), v. 40, n. 5 (September 2024).

    https://doi.org/10.1061/jmenea.meeng-6087

  3. Javanmardi, Ashtad / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, S. Alireza / Liu, Min (2023): Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study. In: Buildings, v. 13, n. 9 (23 August 2023).

    https://doi.org/10.3390/buildings13092379

  4. Chen, Gongfan / Liu, Min / Zhang, Yuxiang / Wang, Zhigao / Hsiang, Simon M. / He, Chuanni (2023): Using Images to Detect, Plan, Analyze, and Coordinate a Smart Contract in Construction. In: Journal of Management in Engineering (ASCE), v. 39, n. 2 (March 2023).

    https://doi.org/10.1061/jmenea.meeng-5121

  5. He, Chuanni / Liu, Min / Zhang, Yuxiang / Wang, Zhigao / Hsiang, Simon M. / Chen, Gongfan / Li, Weiqiang / Dai, Gongfu (2023): Space–Time–Workforce Visualization and Conditional Capacity Synthesis in Uncertainty. In: Journal of Management in Engineering (ASCE), v. 39, n. 2 (March 2023).

    https://doi.org/10.1061/jmenea.meeng-4991

  6. He, Chuanni / Liu, Min / Zhang, Yuxiang / Wang, Zhigao / Hsiang, Simon M. / Chen, Gongfan / Chen, Jiang (2022): Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff. In: Journal of Management in Engineering (ASCE), v. 38, n. 4 (July 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001037

  7. He, Chuanni / Liu, Min / Alves, Thaís da C. L. / Scala, Natalie M. / Hsiang, Simon M. (2022): Prioritizing collaborative scheduling practices based on their impact on project performance. In: Construction Management and Economics, v. 40, n. 7-8 (17 July 2022).

    https://doi.org/10.1080/01446193.2022.2048042

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine