- (2024): Utilizing Large Language Models to Illustrate Constraints for Construction Planning. Dans: Buildings, v. 14, n. 8 (23 juillet 2024).
- Improving Construction Meeting Effectiveness: Trade-Offs between Reactive and Proactive Site-Level Planning Discussions. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 5 (septembre 2024). (2024):
- (2023): Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study. Dans: Buildings, v. 13, n. 9 (23 août 2023).
- Using Images to Detect, Plan, Analyze, and Coordinate a Smart Contract in Construction. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 2 (mars 2023). (2023):
- Space–Time–Workforce Visualization and Conditional Capacity Synthesis in Uncertainty. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 2 (mars 2023). (2023):
- Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 4 (juillet 2022). (2022):
- Prioritizing collaborative scheduling practices based on their impact on project performance. Dans: Construction Management and Economics, v. 40, n. 7-8 (17 juillet 2022). (2022):