Prioritizing collaborative scheduling practices based on their impact on project performance
Auteur(s): |
Chuanni He
Min Liu Thaís da C. L. Alves Natalie M. Scala Simon M. Hsiang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Construction Management and Economics, 17 juillet 2022, n. 7-8, v. 40 |
Page(s): | 1-20 |
DOI: | 10.1080/01446193.2022.2048042 |
- Informations
sur cette fiche - Reference-ID
10660512 - Publié(e) le:
28.03.2022 - Modifié(e) le:
13.08.2022