-
Javanmardi, Ashtad / Liu, Min / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, Alireza (2024): Improving Construction Meeting Effectiveness: Trade-Offs between Reactive and Proactive Site-Level Planning Discussions. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 5 (septembre 2024).
https://doi.org/10.1061/jmenea.meeng-6087
-
Ding, Fan / Liu, Min / Hsiang, Simon M. / Hu, Peng / Zhang, Yuxiang / Jiang, Kewang (2024): Duration and Labor Resource Optimization for Construction Projects—A Conditional-Value-at-Risk-Based Analysis. Dans: Buildings, v. 14, n. 2 (1 février 2024).
https://doi.org/10.3390/buildings14020553
-
Javanmardi, Ashtad / He, Chuanni / Hsiang, Simon M. / Abbasian-Hosseini, S. Alireza / Liu, Min (2023): Enhancing Construction Project Workflow Reliability through Observe–Plan–Do–Check–React Cycle: A Bridge Project Case Study. Dans: Buildings, v. 13, n. 9 (23 août 2023).
https://doi.org/10.3390/buildings13092379
-
Chen, Gongfan / Liu, Min / Li, Huaming / Hsiang, Simon M. / Jarvamard, Ashtad (2023): Motivating Reliable Collaboration for Modular Construction: Shapley Value–Based Smart Contract. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 6 (novembre 2023).
https://doi.org/10.1061/jmenea.meeng-5428
-
Chen, Gongfan / Liu, Min / Zhang, Yuxiang / Wang, Zhigao / Hsiang, Simon M. / He, Chuanni (2023): Using Images to Detect, Plan, Analyze, and Coordinate a Smart Contract in Construction. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 2 (mars 2023).
https://doi.org/10.1061/jmenea.meeng-5121
-
He, Chuanni / Liu, Min / Zhang, Yuxiang / Wang, Zhigao / Hsiang, Simon M. / Chen, Gongfan / Li, Weiqiang / Dai, Gongfu (2023): Space–Time–Workforce Visualization and Conditional Capacity Synthesis in Uncertainty. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 2 (mars 2023).
https://doi.org/10.1061/jmenea.meeng-4991
-
Chen, Gongfan / Li, Huaming / Liu, Min / Hsiang, Simon M. / Jarvamardi, Ashtad (2023): Knowing what is going on – a smart contract for modular construction. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 3 (1 mars 2023).
https://doi.org/10.1139/cjce-2021-0649
-
He, Chuanni / Liu, Min / Zhang, Yuxiang / Wang, Zhigao / Hsiang, Simon M. / Chen, Gongfan / Chen, Jiang (2022): Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 4 (juillet 2022).
https://doi.org/10.1061/(asce)me.1943-5479.0001037
-
He, Chuanni / Liu, Min / Alves, Thaís da C. L. / Scala, Natalie M. / Hsiang, Simon M. (2022): Prioritizing collaborative scheduling practices based on their impact on project performance. Dans: Construction Management and Economics, v. 40, n. 7-8 (17 juillet 2022).
https://doi.org/10.1080/01446193.2022.2048042
-
Liu, YanChun / Jarvamardi, Ashtad / Zhang, Yuxiang / Liu, Min / Hsiang, Simon M. / Yang, ShuJuan / Yu, XiuXia / Jiang, Zhihao (2021): Comparative Study on Perception of Causes for Construction Task Delay in China and the United States. Dans: Journal of Construction Engineering and Management, v. 147, n. 3 (mars 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0001985
-
Zhang, Yuxiang / Javanmardi, Ashtad / Liu, YanChun / Yang, ShuJuan / Yu, XiuXia / Hsiang, Simon M. / Jiang, Zhihao / Liu, Min (2020): How Does Experience with Delay Shape Managers’ Making-Do Decision: Random Forest Approach. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000776
-
Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2020): Improving Effectiveness of Constraints Removal in Construction Planning Meetings: Information-Theoretic Approach. Dans: Journal of Construction Engineering and Management, v. 146, n. 4 (avril 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001790
-
Javanmardi, Ashtad / Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2018): Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 2 (mars 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000578
-
Wambeke, Brad W. / Liu, Min / Hsiang, Simon M. (2014): Task Variation and the Social Network of Construction Trades. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 4 (juillet 2014).
https://doi.org/10.1061/(asce)me.1943-5479.0000219
-
Hollar, Donna A. / Rasdorf, William / Liu, Min / Hummer, Joseph E. / Arocho, Ingrid / Hsiang, Simon M. (2013): Preliminary Engineering Cost Estimation Model for Bridge Projects. Dans: Journal of Construction Engineering and Management, v. 139, n. 9 (septembre 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000668
-
Wambeke, Brad W. / Hsiang, Simon M. / Liu, Min (2011): Causes of Variation in Construction Project Task Starting Times and Duration. Dans: Journal of Construction Engineering and Management, v. 137, n. 9 (septembre 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000342
-
Wambeke, Brad W. / Liu, Min / Hsiang, Simon M. (2012): Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks. Dans: Journal of Construction Engineering and Management, v. 138, n. 4 (avril 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000444
-
Wang, Chao / Liu, Min / Hsiang, Simon M. / Leming, Michael L. (2012): Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility. Dans: Journal of Construction Engineering and Management, v. 138, n. 6 (juin 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000475
-
Abbasian-Hosseini, S. Alireza / Liu, Min / Hsiang, Simon M. (2017): Social network conformity and construction work plan reliability. Dans: Automation in Construction, v. 78 (juin 2017).
https://doi.org/10.1016/j.autcon.2017.01.004
-
Abbasian-Hosseini, S. Alireza / Hsiang, Simon M. / Leming, Michael L. / Liu, Min (2014): From Social Network to Data Envelopment Analysis: Identifying Benchmarks at the Site Management Level. Dans: Journal of Construction Engineering and Management, v. 140, n. 8 (août 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000875
-
Wambeke, Brad W. / Liu, Min / Hsiang, Simon M. (2012): Using Pajek and Centrality Analysis to Identify a Social Network of Construction Trades. Dans: Journal of Construction Engineering and Management, v. 138, n. 10 (octobre 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000524
-
Russell, Marion M. / Hsiang, Simon M. / Liu, Min / Wambeke, Brad (2014): Causes of Time Buffer and Duration Variation in Construction Project Tasks: Comparison of Perception to Reality. Dans: Journal of Construction Engineering and Management, v. 140, n. 6 (juin 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000819
-
Hajifathalian, Kiarash / Wambeke, Brad W. / Liu, Min / Hsiang, Simon M. (2012): Effects of Production Control Strategy and Duration Variance on Productivity and Work in Process: Simulation-Based Investigation. Dans: Journal of Construction Engineering and Management, v. 138, n. 9 (septembre 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000517
-
Russell, Marion M. / Howell, Gregory / Hsiang, Simon M. / Liu, Min (2013): Application of Time Buffers to Construction Project Task Durations. Dans: Journal of Construction Engineering and Management, v. 139, n. 10 (octobre 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000735
-
Russell, Marion M. / Liu, Min / Howell, Gregory / Hsiang, Simon M. (2015): Case Studies of the Allocation and Reduction of Time Buffer through Use of the Last Planner System. Dans: Journal of Construction Engineering and Management, v. 141, n. 2 (février 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000900
-
Hajifathalian, Kiarash / Howell, Gregory / Wambeke, Brad W. / Hsiang, Simon M. / Liu, Min (2016): "Oops" Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities. Dans: Journal of Construction Engineering and Management, v. 142, n. 8 (août 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001135