Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks
Auteur(s): |
Brad W. Wambeke
Min Liu Simon M. Hsiang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, avril 2012, n. 4, v. 138 |
Page(s): | 491-498 |
DOI: | 10.1061/(asce)co.1943-7862.0000444 |
- Informations
sur cette fiche - Reference-ID
10156111 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018