Brad W. Wambeke
- Task Variation and the Social Network of Construction Trades. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 4 (juillet 2014). (2014):
- Causes of Variation in Construction Project Task Starting Times and Duration. Dans: Journal of Construction Engineering and Management, v. 137, n. 9 (septembre 2011). (2011):
- Using Last Planner and a Risk Assessment Matrix to Reduce Variation in Mechanical Related Construction Tasks. Dans: Journal of Construction Engineering and Management, v. 138, n. 4 (avril 2012). (2012):
- Using Pajek and Centrality Analysis to Identify a Social Network of Construction Trades. Dans: Journal of Construction Engineering and Management, v. 138, n. 10 (octobre 2012). (2012):
- Effects of Production Control Strategy and Duration Variance on Productivity and Work in Process: Simulation-Based Investigation. Dans: Journal of Construction Engineering and Management, v. 138, n. 9 (septembre 2012). (2012):
- "Oops" Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities. Dans: Journal of Construction Engineering and Management, v. 142, n. 8 (août 2016). (2016):