"Oops" Simulation: Cost–Benefits Trade-Off Analysis of Reliable Planning for Construction Activities
Auteur(s): |
Kiarash Hajifathalian
Gregory Howell Brad W. Wambeke Simon M. Hsiang Min Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, août 2016, n. 8, v. 142 |
Page(s): | 04016030 |
DOI: | 10.1061/(asce)co.1943-7862.0001135 |
- Informations
sur cette fiche - Reference-ID
10170455 - Publié(e) le:
02.12.2018 - Modifié(e) le:
29.05.2022