0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Exploit Social Distancing in Construction Scheduling: Visualize and Optimize Space–Time–Workforce Tradeoff

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)me.1943-5479.0001037.
  • About this
    data sheet
  • Reference-ID
    10679838
  • Published on:
    18/06/2022
  • Last updated on:
    18/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine