Utilizing Large Language Models to Illustrate Constraints for Construction Planning

Author(s): ORCID
ORCID
ORCID
ORCID


Medium: journal article
Language(s): English
Published in: Buildings, , n. 8, v. 14
Page(s): 2511
DOI: 10.3390/buildings14082511
Abstract:

Effective construction project planning relies on addressing constraints related to materials, labor, equipment, and others. Planning meetings are typical venues for stakeholders to identify, communicate, and remove constraints. However, a critical gap exists in lacking an automated approach to identify, classify, analyze, and track constraint discussions during onsite planning meetings. Therefore, this research aims to 1. develop a natural language processing model to classify constraints in meeting discussions; 2. uncover the discussion patterns of managers and foremen regarding various constraints; and 3. extract the root causes for constraints, evaluate their impacts, and prepare managers to develop practical solutions for constraint removal. This research collected meeting transcripts from 94 onsite planning meetings of a building project, spanning 263,836 words. Next, this research leveraged a general pretrained transformer (GPT) to segment discussion dialogs into topics. A Bidirectional Encoder Representations from Transformers (BERT)-based model was developed to categorize constraint types for each topic. The constraint patterns among meeting attendees were assessed. Furthermore, a GPT-based tool was devised to track root causes, impacts, and solutions for various constraints. Test results revealed an 8.8% improvement in constraint classification accuracy compared with the traditional classification model. An occupational characteristic in constraint discussion was observed in that the management team tended to balance their focus on various constraints, while foremen concentrated on more practical issues. This research contributes to the body of knowledge by leveraging language models to analyze construction planning meetings. The findings facilitate project managers in establishing constraint logs for diagnosing and prognosticating planning issues.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10795679
  • Published on:
    01/09/2024
  • Last updated on:
    01/09/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine