0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Cha, Hee Sung / O'Connor, James T. (2006): Characteristics for Leveraging Value Management Processes on Capital Facility Projects. In: Journal of Management in Engineering (ASCE), v. 22, n. 3 (July 2006).

    https://doi.org/10.1061/(asce)0742-597x(2006)22:3(135)

  2. Cha, Hee Sung / Shin, Kang Yong (2011): Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea. In: Journal of Asian Architecture and Building Engineering, v. 10, n. 2 (November 2011).

    https://doi.org/10.3130/jaabe.10.437

  3. Yoon, Jong Han / Cha, Hee Sung / Kim, Jinyoung (2019): Three-Dimensional Location-Based O&M Data Management System for Large Commercial Office Buildings. In: Journal of Performance of Constructed Facilities (ASCE), v. 33, n. 2 (April 2019).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001270

  4. Cha, Hee Sung / Lee, Dong Gun (2015): A case study of time/cost analysis for aged-housing renovation using a pre-made BIM database structure. In: KSCE Journal of Civil Engineering, v. 19, n. 4 (February 2015).

    https://doi.org/10.1007/s12205-013-0617-1

  5. Cha, Hee Sung / Kim, Jeehye / Han, Ju-Yeoun (2009): Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects. In: Journal of Construction Engineering and Management, v. 135, n. 7 (July 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:7(647)

  6. Cha, Hee Sung / Kim, Ki Hyun (2017): Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea. In: KSCE Journal of Civil Engineering, v. 22, n. 5 (August 2017).

    https://doi.org/10.1007/s12205-017-0156-2

  7. Cha, Hee Sung / Kim, Chan Kyu (2011): Quantitative approach for project performance measurement on building construction in South Korea. In: KSCE Journal of Civil Engineering, v. 15, n. 8 (November 2011).

    https://doi.org/10.1007/s12205-011-1323-5

  8. Cha, Hee Sung / O'Connor, James T. (2005): Optimizing Implementation of Value Management Processes for Capital Projects. In: Journal of Construction Engineering and Management, v. 131, n. 2 (February 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:2(239)

  9. Yoon, Jong Han / Cha, Hee Sung (2018): Optimal FM Strategy for Commercial Office Buildings Using Fuzzy Synthetic Evaluation. In: Journal of Performance of Constructed Facilities (ASCE), v. 32, n. 3 (June 2018).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001176

  10. Cha, Hee Sung / Kim, Ki Hyun / Kim, Chan Kyu (2012): Case Study on Selective Demolition Method for Refurbishing Deteriorated Residential Apartments. In: Journal of Construction Engineering and Management, v. 138, n. 2 (February 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000424

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine