0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Cha, Hee Sung / O'Connor, James T. (2006): Characteristics for Leveraging Value Management Processes on Capital Facility Projects. Dans: Journal of Management in Engineering (ASCE), v. 22, n. 3 (juillet 2006).

    https://doi.org/10.1061/(asce)0742-597x(2006)22:3(135)

  2. Cha, Hee Sung / Shin, Kang Yong (2011): Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea. Dans: Journal of Asian Architecture and Building Engineering, v. 10, n. 2 (novembre 2011).

    https://doi.org/10.3130/jaabe.10.437

  3. Yoon, Jong Han / Cha, Hee Sung / Kim, Jinyoung (2019): Three-Dimensional Location-Based O&M Data Management System for Large Commercial Office Buildings. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 33, n. 2 (avril 2019).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001270

  4. Cha, Hee Sung / Lee, Dong Gun (2015): A case study of time/cost analysis for aged-housing renovation using a pre-made BIM database structure. Dans: KSCE Journal of Civil Engineering, v. 19, n. 4 (février 2015).

    https://doi.org/10.1007/s12205-013-0617-1

  5. Cha, Hee Sung / Kim, Jeehye / Han, Ju-Yeoun (2009): Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects. Dans: Journal of Construction Engineering and Management, v. 135, n. 7 (juillet 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:7(647)

  6. Cha, Hee Sung / Kim, Ki Hyun (2017): Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea. Dans: KSCE Journal of Civil Engineering, v. 22, n. 5 (août 2017).

    https://doi.org/10.1007/s12205-017-0156-2

  7. Cha, Hee Sung / Kim, Chan Kyu (2011): Quantitative approach for project performance measurement on building construction in South Korea. Dans: KSCE Journal of Civil Engineering, v. 15, n. 8 (novembre 2011).

    https://doi.org/10.1007/s12205-011-1323-5

  8. Cha, Hee Sung / O'Connor, James T. (2005): Optimizing Implementation of Value Management Processes for Capital Projects. Dans: Journal of Construction Engineering and Management, v. 131, n. 2 (février 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:2(239)

  9. Yoon, Jong Han / Cha, Hee Sung (2018): Optimal FM Strategy for Commercial Office Buildings Using Fuzzy Synthetic Evaluation. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 32, n. 3 (juin 2018).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001176

  10. Cha, Hee Sung / Kim, Ki Hyun / Kim, Chan Kyu (2012): Case Study on Selective Demolition Method for Refurbishing Deteriorated Residential Apartments. Dans: Journal of Construction Engineering and Management, v. 138, n. 2 (février 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000424

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine