Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea
Auteur(s): |
Hee Sung Cha
Kang Yong Shin |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Asian Architecture and Building Engineering, novembre 2011, n. 2, v. 10 |
Page(s): | 437-444 |
DOI: | 10.3130/jaabe.10.437 |
- Informations
sur cette fiche - Reference-ID
10331443 - Publié(e) le:
29.07.2019 - Modifié(e) le:
29.07.2019