Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea
Author(s): |
Hee Sung Cha
Kang Yong Shin |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Asian Architecture and Building Engineering, November 2011, n. 2, v. 10 |
Page(s): | 437-444 |
DOI: | 10.3130/jaabe.10.437 |
- About this
data sheet - Reference-ID
10331443 - Published on:
29/07/2019 - Last updated on:
29/07/2019