Hee Sung Cha
- Characteristics for Leveraging Value Management Processes on Capital Facility Projects. In: Journal of Management in Engineering (ASCE), v. 22, n. 3 (Juli 2006). (2006):
- Predicting Project Cost Performance Level by Assessing Risk Factors of Building Construction in South Korea. In: Journal of Asian Architecture and Building Engineering, v. 10, n. 2 (November 2011). (2011):
- Three-Dimensional Location-Based O&M Data Management System for Large Commercial Office Buildings. In: Journal of Performance of Constructed Facilities (ASCE), v. 33, n. 2 (April 2019). (2019):
- A case study of time/cost analysis for aged-housing renovation using a pre-made BIM database structure. In: KSCE Journal of Civil Engineering, v. 19, n. 4 (Februar 2015). (2015):
- Identifying and Assessing Influence Factors on Improving Waste Management Performance for Building Construction Projects. In: Journal of Construction Engineering and Management, v. 135, n. 7 (Juli 2009). (2009):
- Measuring Project Performance in Consideration of Optimal Best Management Practices for Building Construction in South Korea. In: KSCE Journal of Civil Engineering, v. 22, n. 5 (August 2017). (2017):
- Quantitative approach for project performance measurement on building construction in South Korea. In: KSCE Journal of Civil Engineering, v. 15, n. 8 (November 2011). (2011):
- Optimizing Implementation of Value Management Processes for Capital Projects. In: Journal of Construction Engineering and Management, v. 131, n. 2 (Februar 2005). (2005):
- Optimal FM Strategy for Commercial Office Buildings Using Fuzzy Synthetic Evaluation. In: Journal of Performance of Constructed Facilities (ASCE), v. 32, n. 3 (Juni 2018). (2018):
- Case Study on Selective Demolition Method for Refurbishing Deteriorated Residential Apartments. In: Journal of Construction Engineering and Management, v. 138, n. 2 (Februar 2012). (2012):