-
Yang, Juneseok / Arditi, David / Lee, Dong-Eun / Mutis, Ivan (2022): Delay Analysis Selection Model for a Construction Project. In: KSCE Journal of Civil Engineering, v. 26, n. 12 (September 2022).
https://doi.org/10.1007/s12205-022-2394-1
-
Wang, Xiaowei / Arditi, David / Ye, Kunhui (2022): Coupling Effects of Economic, Industrial, and Geographical Factors on Collusive Bidding Decisions. In: Journal of Construction Engineering and Management, v. 148, n. 7 (July 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002291
-
Arditi, David / Ayrancioglu, Mehmet A. / Shi, Jonathan (2004): Effectiveness of Safety Vests in Nighttime Highway Construction. In: Journal of Transportation Engineering, v. 130, n. 6 (November 2004).
https://doi.org/10.1061/(asce)0733-947x(2004)130:6(725)
-
Wang, Xiaowei / Ye, Kunhui / Arditi, David (2021): Embodied Cost of Collusive Bidding: Evidence from China’s Construction Industry. In: Journal of Construction Engineering and Management, v. 147, n. 6 (June 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002044
-
Türkakın, Osman Hürol / Manisali, Ekrem / Arditi, David (2020): Delay analysis in construction projects with no updated work schedules. In: Engineering, Construction and Architectural Management, v. 27, n. 10 ( 2020).
https://doi.org/10.1108/ecam-09-2019-0470
-
Arditi, David / Nawakorawit, Manop (1999): Designing buildings for maintenance using property manager input. Presented at: IABSE Symposium: Structures for the Future - The Search for Quality, Rio de Janeiro, Brazil, 25-27 August 1999.
https://doi.org/10.5169/seals-62859
-
Komurlu, Ruveyda / Arditi, David / Gurgun, Asli Pelin (2015): Energy and atmosphere standards for sustainable design and construction in different countries. In: Energy and Buildings, v. 90 (March 2015).
https://doi.org/10.1016/j.enbuild.2015.01.010
-
Lim, Tae-Kyung / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2014): Concurrent Construction Scheduling Simulation Algorithm. In: Computer-Aided Civil and Infrastructure Engineering, v. 29, n. 6 (March 2014).
https://doi.org/10.1111/mice.12073
-
Ozorhon, Beliz / Arditi, David / Dikmen, Irem / Birgonul, M. Talat (2008): Effect of Partner Fit in International Construction Joint Ventures. In: Journal of Management in Engineering (ASCE), v. 24, n. 1 (January 2008).
https://doi.org/10.1061/(asce)0742-597x(2008)24:1(12)
-
Kale, Serdar / Arditi, David (2003): Differentiation, Conformity, and Construction Firm Performance. In: Journal of Management in Engineering (ASCE), v. 19, n. 2 (April 2003).
https://doi.org/10.1061/(asce)0742-597x(2003)19:2(52)
-
Akcay, Emre Caner / Arditi, David (2017): Desired points at minimum cost in the "Optimize Energy Performance" credit of leed certification. In: Journal of Civil Engineering and Management, v. 23, n. 6 (June 2017).
https://doi.org/10.3846/13923730.2017.1319412
-
Li, Huimin / Arditi, David / Wang, Zhuofu (2015): Determinants of Transaction Costs in Construction Projects. In: Journal of Civil Engineering and Management, v. 21, n. 5 (May 2015).
https://doi.org/10.3846/13923730.2014.897973
-
Kanoglu, Alaattin / Arditi, David (2001): A computer‐based information system for architectural design offices. In: Construction Innovation, v. 1, n. 1 (March 2001).
https://doi.org/10.1108/14714170110814488
-
Poku, Stephen E. / Arditi, David (2006): Construction Scheduling and Progress Control Using Geographical Information Systems. In: Journal of Computing in Civil Engineering, v. 20, n. 5 (September 2006).
https://doi.org/10.1061/(asce)0887-3801(2006)20:5(351)
-
Arditi, David (1983): Diffusion of Network Planning in Construction. In: Journal of Construction Engineering and Management, v. 109, n. 1 (March 1983).
https://doi.org/10.1061/(asce)0733-9364(1983)109:1(1)
-
Arditi, David (1985): Construction Productivity Improvement. In: Journal of Construction Engineering and Management, v. 111, n. 1 (March 1985).
https://doi.org/10.1061/(asce)0733-9364(1985)111:1(1)
-
Doğan, Sevgi Zeynep / Arditi, David / Gunaydin, H. Murat (2006): Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural Systems. In: Journal of Construction Engineering and Management, v. 132, n. 10 (October 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:10(1092)
-
Shi, Jonathan Jingsheng / Cheung, S. O. / Arditi, David (2001): Construction Delay Computation Method. In: Journal of Construction Engineering and Management, v. 127, n. 1 (February 2001).
https://doi.org/10.1061/(asce)0733-9364(2001)127:1(60)
-
Kale, Serdar / Arditi, David (2005): Diffusion of Computer Aided Design Technology in Architectural Design Practice. In: Journal of Construction Engineering and Management, v. 131, n. 10 (October 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1135)
-
Arditi, David / Elhassan, Ahmed / Toklu, Y. Cengiz (2002): Constructability Analysis in the Design Firm. In: Journal of Construction Engineering and Management, v. 128, n. 2 (April 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:2(117)
-
Arditi, David / Ongkasuwan, Dumrong / Committee on Management Practices in Construction (MPIC) of the ASCE Construction Institute, The (2009): Duties and Responsibilities of Construction Managers: Perceptions of Parties Involved in Construction. In: Journal of Construction Engineering and Management, v. 135, n. 12 (December 2009).
https://doi.org/10.1061/(asce)co.1943-7862.0000115
-
Chotibhongs, Ranon / Arditi, David (2012): Detection of Collusive Behavior. In: Journal of Construction Engineering and Management, v. 138, n. 11 (November 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000542
-
Bolukbasi, M. Melik / Arditi, David / Mohammadi, Jamshid (2006): Deterioration of reconstructed bridge decks. In: Structure and Infrastructure Engineering, v. 2, n. 1 (March 2006).
https://doi.org/10.1080/15732470500030935
-
Polat, Gul / Arditi, David / Ballard, Glenn / Mungen, Ugur (2006): Economics of on‐site vs. off‐site fabrication of rebar. In: Construction Management and Economics, v. 24, n. 11 (November 2006).
https://doi.org/10.1080/01446190500529432
-
Pulket, Thaveeporn / Arditi, David (2009): Construction litigation prediction system using ant colony optimization. In: Construction Management and Economics, v. 27, n. 3 (March 2009).
https://doi.org/10.1080/01446190802714781
-
Arditi, David (2012): Construction Quality Management: Principles and Practice. In: Construction Management and Economics, v. 30, n. 6 (June 2012).
https://doi.org/10.1080/01446193.2012.675440
-
Kale, Serdar / Arditi, David (2006): Diffusion of ISO 9000 certification in the precast concrete industry. In: Construction Management and Economics, v. 24, n. 5 (May 2006).
https://doi.org/10.1080/01446190600601594
-
Arditi, David / Chotibhongs, Ranon (2009): Detection and prevention of unbalanced bids. In: Construction Management and Economics, v. 27, n. 8 (August 2009).
https://doi.org/10.1080/01446190903117785
-
Arditi, David / Suh, Kangsuck (1991): Estimating system selection expert. In: Construction Management and Economics, v. 9, n. 4 (July 1991).
https://doi.org/10.1080/01446199100000029
-
Arditi, David / Nawakorawit, Manop (1999): Designing Buildings for Maintenance: Designers' Perspective. In: Journal of Architectural Engineering (ASCE), v. 5, n. 4 (December 1999).
https://doi.org/10.1061/(asce)1076-0431(1999)5:4(107)