0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Akin, Firat Dogu / Damci, Atilla / Arditi, David / Demirkesen Cakir, Sevilay: An advanced decision-support system for ranking unbalanced bids. In: Construction Management and Economics.

    https://doi.org/10.1080/01446193.2024.2303158

  2. Zhang, Chengyi / Arditi, David (2020): Advanced Progress Control of Infrastructure Construction Projects Using Terrestrial Laser Scanning Technology. In: Infrastructures, v. 5, n. 10 (October 2020).

    https://doi.org/10.3390/infrastructures5100083

  3. Li, Huimin / Zhang, Chengyi / Liu, Yingjie / Arditi, David / Xu, Chenchen / Shim, Euysup (2022): Academia and Industry Perceptions of Construction Planning and Scheduling Education. In: Journal of Civil Engineering Education, v. 148, n. 3 (July 2022).

    https://doi.org/10.1061/(asce)ei.2643-9115.0000064

  4. Arditi, David / Koksal, Almula / Kale, Serdar (2000): Business failures in the construction industry. In: Engineering, Construction and Architectural Management, v. 7, n. 2 (February 2000).

    https://doi.org/10.1108/eb021137

  5. Damci, Atilla / Arditi, David / Polat, Gul (2017): Civil engineers’ personal values/demographics linkage in project team building. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017).

    https://doi.org/10.1108/ecam-08-2016-0182

  6. Komurlu, Ruveyda / Arditi, David / Gurgun, Asli Pelin (2014): Applicability of LEED's energy and atmosphere category in three developing countries. In: Energy and Buildings, v. 84 (December 2014).

    https://doi.org/10.1016/j.enbuild.2014.07.095

  7. Lee, Hyung-Guk / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2015): An Advanced Stochastic Time-Cost Tradeoff Analysis Based on a CPM-Guided Genetic Algorithm. In: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 10 (June 2015).

    https://doi.org/10.1111/mice.12148

  8. Lim, Tae-Kyung / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2014): Concurrent Construction Scheduling Simulation Algorithm. In: Computer-Aided Civil and Infrastructure Engineering, v. 29, n. 6 (March 2014).

    https://doi.org/10.1111/mice.12073

  9. Doğan, Sevgi Zeynep / Arditi, David / Günhan, Suat / Erbasaranoglu, Bengi (2015): Assessing Coordination Performance Based on Centrality in an E-mail Communication Network. In: Journal of Management in Engineering (ASCE), v. 31, n. 3 (May 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000255

  10. Tulubas Gokuc, Yeliz / Arditi, David (2017): Adoption of BIM in architectural design firms. In: Architectural Science Review, v. 60, n. 6 (October 2017).

    https://doi.org/10.1080/00038628.2017.1383228

  11. Günhan, Suat / Arditi, David / Doyle, Jacqueline (2007): Avoiding Change Orders in Public School Construction. In: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (January 2007).

    https://doi.org/10.1061/(asce)1052-3928(2007)133:1(67)

  12. Gurgun, Asli / Arditi, David (2018): Assessment of Energy Credits in LEED-Certified Buildings Based on Certification Levels and Project Ownership. In: Buildings, v. 8, n. 2 (January 2018).

    https://doi.org/10.3390/buildings8020029

  13. Kanoglu, Alaattin / Arditi, David (2001): A computer‐based information system for architectural design offices. In: Construction Innovation, v. 1, n. 1 (March 2001).

    https://doi.org/10.1108/14714170110814488

  14. Arditi, David / Tokdemir, Onur Behzat (1999): Comparison of Case-Based Reasoning and Artificial Neural Networks. In: Journal of Computing in Civil Engineering, v. 13, n. 3 (July 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:3(162)

  15. Kale, Serdar / Arditi, David (2002): Competitive Positioning in United States Construction Industry. In: Journal of Construction Engineering and Management, v. 128, n. 3 (June 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:3(238)

  16. Kale, Serdar / Arditi, David (1998): Business Failures: Liabilities of Newness, Adolescence, and Smallness. In: Journal of Construction Engineering and Management, v. 124, n. 6 (December 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:6(458)

  17. Arditi, David / Elhassan, Ahmed / Toklu, Y. Cengiz (2002): Constructability Analysis in the Design Firm. In: Journal of Construction Engineering and Management, v. 128, n. 2 (April 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:2(117)

  18. Algarni, Ayed Muhammad / Arditi, David / Polat, Gul (2007): Build-Operate-Transfer in Infrastructure Projects in the United States. In: Journal of Construction Engineering and Management, v. 133, n. 10 (October 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:10(728)

  19. Arditi, David / Tokdemir, Onur B. / Suh, Kangsuk (2002): Challenges in Line-of-Balance Scheduling. In: Journal of Construction Engineering and Management, v. 128, n. 6 (December 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:6(545)

  20. Riad, Nagui I. / Arditi, David / Mohammadi, Jamshid (1995): Computerized Time Impact Analysis for Project Acceleration. In: Computer-Aided Civil and Infrastructure Engineering, v. 10, n. 2 (March 1995).

    https://doi.org/10.1111/j.1467-8667.1995.tb00276.x

  21. Lee, Dong-Eun / Lim, Tae-Kyung / Arditi, David (2009): Automated stochastic quality function deployment system for measuring the quality performance of design/build contractors. In: Automation in Construction, v. 18, n. 3 (May 2009).

    https://doi.org/10.1016/j.autcon.2008.10.002

  22. Zhang, Chengyi / Arditi, David (2013): Automated progress control using laser scanning technology. In: Automation in Construction, v. 36 (December 2013).

    https://doi.org/10.1016/j.autcon.2013.08.012

  23. Günhan, Suat / Arditi, David (2007): Budgeting Owner's Construction Contingency. In: Journal of Construction Engineering and Management, v. 133, n. 7 (July 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:7(492)

  24. Lee, Dong-Eun / Arditi, David (2006): Automated Statistical Analysis in Stochastic Project Scheduling Simulation. In: Journal of Construction Engineering and Management, v. 132, n. 3 (March 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(268)

  25. Arditi, David / Pattanakitchamroon, Thanat (2008): Analysis Methods in Time-Based Claims. In: Journal of Construction Engineering and Management, v. 134, n. 4 (April 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:4(242)

  26. Arditi, David / Lee, Dong-Eun (2003): Assessing the corporate service quality performance of design-build contractors using quality function deployment. In: Construction Management and Economics, v. 21, n. 2 (February 2003).

    https://doi.org/10.1080/0144619032000079716

  27. Yasamis, Firuzan / Arditi, David / Mohammadi, Jamshid (2002): Assessing contractor quality performance. In: Construction Management and Economics, v. 20, n. 3 (April 2002).

    https://doi.org/10.1080/01446190110113693

  28. Chotibhongs, Ranon / Arditi, David (2012): Analysis of collusive bidding behaviour. In: Construction Management and Economics, v. 30, n. 3 (March 2012).

    https://doi.org/10.1080/01446193.2012.661443

  29. Tokdemir, Onur B. / Arditi, David / Balcik, Cenk (2006): ALISS: Advanced Linear Scheduling System. In: Construction Management and Economics, v. 24, n. 12 (December 2006).

    https://doi.org/10.1080/01446190600953706

  30. Kale, Serdar / Arditi, David (1999): Age-dependent business failures in the US construction industry. In: Construction Management and Economics, v. 17, n. 4 (July 1999).

    https://doi.org/10.1080/014461999371411

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine