-
Zhang, Chengyi / Zhu, Xuanyi / Gerace, Selena / Olorunnishola, Ayoola / Arditi, David / Wang, Wensheng (2024): Analysis of the Cost of Retraining Workers Employed in the Fossil Fuel Energy Industries for Jobs in Low-Carbon Energy Industries: A Case Study in Wyoming. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 6 (novembre 2024).
https://doi.org/10.1061/jmenea.meeng-6147
-
Turkoglu, Harun / Arditi, David / Polat, Gul (2024): Augmented Time–Cost Trade-Off Optimization Using Particle Swarm Optimization. Dans: Journal of Construction Engineering and Management, v. 150, n. 5 (mai 2024).
https://doi.org/10.1061/jcemd4.coeng-14314
-
Gurgun, Asli Pelin / Kunkcu, Handan / Koc, Kerim / Arditi, David / Atabay, Senay (2024): Challenges in the Integration of E-Procurement Procedures into Construction Supply Chains. Dans: Buildings, v. 14, n. 3 (21 février 2024).
https://doi.org/10.3390/buildings14030605
-
Akin, Firat Dogu / Damci, Atilla / Arditi, David / Demirkesen Cakir, Sevilay (2024): An advanced decision-support system for ranking unbalanced bids. Dans: Construction Management and Economics, v. 42, n. 7 (février 2024).
https://doi.org/10.1080/01446193.2024.2303158
-
Zhang, Chengyi / Arditi, David (2020): Advanced Progress Control of Infrastructure Construction Projects Using Terrestrial Laser Scanning Technology. Dans: Infrastructures, v. 5, n. 10 (octobre 2020).
https://doi.org/10.3390/infrastructures5100083
-
Li, Huimin / Zhang, Chengyi / Liu, Yingjie / Arditi, David / Xu, Chenchen / Shim, Euysup (2022): Academia and Industry Perceptions of Construction Planning and Scheduling Education. Dans: Journal of Civil Engineering Education, v. 148, n. 3 (juillet 2022).
https://doi.org/10.1061/(asce)ei.2643-9115.0000064
-
Arditi, David / Koksal, Almula / Kale, Serdar (2000): Business failures in the construction industry. Dans: Engineering, Construction and Architectural Management, v. 7, n. 2 (février 2000).
https://doi.org/10.1108/eb021137
-
Damci, Atilla / Arditi, David / Polat, Gul (2017): Civil engineers’ personal values/demographics linkage in project team building. Dans: Engineering, Construction and Architectural Management, v. 24, n. 6 (novembre 2017).
https://doi.org/10.1108/ecam-08-2016-0182
-
Komurlu, Ruveyda / Arditi, David / Gurgun, Asli Pelin (2014): Applicability of LEED's energy and atmosphere category in three developing countries. Dans: Energy and Buildings, v. 84 (décembre 2014).
https://doi.org/10.1016/j.enbuild.2014.07.095
-
Lee, Hyung-Guk / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2015): An Advanced Stochastic Time-Cost Tradeoff Analysis Based on a CPM-Guided Genetic Algorithm. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 10 (juin 2015).
https://doi.org/10.1111/mice.12148
-
Doğan, Sevgi Zeynep / Arditi, David / Günhan, Suat / Erbasaranoglu, Bengi (2015): Assessing Coordination Performance Based on Centrality in an E-mail Communication Network. Dans: Journal of Management in Engineering (ASCE), v. 31, n. 3 (mai 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000255
-
Tulubas Gokuc, Yeliz / Arditi, David (2017): Adoption of BIM in architectural design firms. Dans: Architectural Science Review, v. 60, n. 6 (octobre 2017).
https://doi.org/10.1080/00038628.2017.1383228
-
Günhan, Suat / Arditi, David / Doyle, Jacqueline (2007): Avoiding Change Orders in Public School Construction. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (janvier 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:1(67)
-
Gurgun, Asli / Arditi, David (2018): Assessment of Energy Credits in LEED-Certified Buildings Based on Certification Levels and Project Ownership. Dans: Buildings, v. 8, n. 2 (janvier 2018).
https://doi.org/10.3390/buildings8020029
-
Arditi, David / Tokdemir, Onur Behzat (1999): Comparison of Case-Based Reasoning and Artificial Neural Networks. Dans: Journal of Computing in Civil Engineering, v. 13, n. 3 (juillet 1999).
https://doi.org/10.1061/(asce)0887-3801(1999)13:3(162)
-
Kale, Serdar / Arditi, David (2002): Competitive Positioning in United States Construction Industry. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:3(238)
-
Kale, Serdar / Arditi, David (1998): Business Failures: Liabilities of Newness, Adolescence, and Smallness. Dans: Journal of Construction Engineering and Management, v. 124, n. 6 (décembre 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:6(458)
-
Algarni, Ayed Muhammad / Arditi, David / Polat, Gul (2007): Build-Operate-Transfer in Infrastructure Projects in the United States. Dans: Journal of Construction Engineering and Management, v. 133, n. 10 (octobre 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:10(728)
-
Arditi, David / Tokdemir, Onur B. / Suh, Kangsuk (2002): Challenges in Line-of-Balance Scheduling. Dans: Journal of Construction Engineering and Management, v. 128, n. 6 (décembre 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:6(545)
-
Riad, Nagui I. / Arditi, David / Mohammadi, Jamshid (1995): Computerized Time Impact Analysis for Project Acceleration. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 10, n. 2 (mars 1995).
https://doi.org/10.1111/j.1467-8667.1995.tb00276.x
-
Lee, Dong-Eun / Lim, Tae-Kyung / Arditi, David (2009): Automated stochastic quality function deployment system for measuring the quality performance of design/build contractors. Dans: Automation in Construction, v. 18, n. 3 (mai 2009).
https://doi.org/10.1016/j.autcon.2008.10.002
-
Zhang, Chengyi / Arditi, David (2013): Automated progress control using laser scanning technology. Dans: Automation in Construction, v. 36 (décembre 2013).
https://doi.org/10.1016/j.autcon.2013.08.012
-
Günhan, Suat / Arditi, David (2007): Budgeting Owner's Construction Contingency. Dans: Journal of Construction Engineering and Management, v. 133, n. 7 (juillet 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:7(492)
-
Lee, Dong-Eun / Arditi, David (2006): Automated Statistical Analysis in Stochastic Project Scheduling Simulation. Dans: Journal of Construction Engineering and Management, v. 132, n. 3 (mars 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:3(268)
-
Arditi, David / Pattanakitchamroon, Thanat (2008): Analysis Methods in Time-Based Claims. Dans: Journal of Construction Engineering and Management, v. 134, n. 4 (avril 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:4(242)
-
Arditi, David / Lee, Dong-Eun (2003): Assessing the corporate service quality performance of design-build contractors using quality function deployment. Dans: Construction Management and Economics, v. 21, n. 2 (février 2003).
https://doi.org/10.1080/0144619032000079716
-
Yasamis, Firuzan / Arditi, David / Mohammadi, Jamshid (2002): Assessing contractor quality performance. Dans: Construction Management and Economics, v. 20, n. 3 (avril 2002).
https://doi.org/10.1080/01446190110113693
-
Chotibhongs, Ranon / Arditi, David (2012): Analysis of collusive bidding behaviour. Dans: Construction Management and Economics, v. 30, n. 3 (mars 2012).
https://doi.org/10.1080/01446193.2012.661443
-
Tokdemir, Onur B. / Arditi, David / Balcik, Cenk (2006): ALISS: Advanced Linear Scheduling System. Dans: Construction Management and Economics, v. 24, n. 12 (décembre 2006).
https://doi.org/10.1080/01446190600953706
-
Kale, Serdar / Arditi, David (1999): Age-dependent business failures in the US construction industry. Dans: Construction Management and Economics, v. 17, n. 4 (juillet 1999).
https://doi.org/10.1080/014461999371411