-
Mostofi, Fatemeh / Tokdemir, Onur Behzat / Toğan, Vedat / Arditi, David (2024): Predicting the Cost of Rework in High-Rise Buildings Using Graph Convolutional Networks. In: Journal of Construction Engineering and Management, v. 150, n. 8 (August 2024).
https://doi.org/10.1061/jcemd4.coeng-14739
-
Akcay, Emre Caner / Arditi, David (2022): Predicting Employer and Worker Responsibilities in Accidents That Involve Falls in Building Construction Sites. In: Buildings, v. 12, n. 4 (11 April 2022).
https://doi.org/10.3390/buildings12040464
-
Arditi, David / Krieter, Dan Steven (1985): Railway Route Rationalization: a Valuation Model. In: Journal of Transportation Engineering, v. 111, n. 2 (March 1985).
https://doi.org/10.1061/(asce)0733-947x(1985)111:2(105)
-
Hanioglu, Mehmet Nihat / Arditi, David (2013): Teaming/timing sequences in hotel development projects. In: Construction Management and Economics, v. 31, n. 4 (April 2013).
https://doi.org/10.1080/01446193.2013.778417
-
Arditi, David / Tokdemir, Onur B. / Suh, Kangsuk (2001): Scheduling system for repetitive unit construction using line‐of‐balance technology. In: Engineering, Construction and Architectural Management, v. 8, n. 2 (February 2001).
https://doi.org/10.1108/eb021173
-
Işik, Zeynep / Arditi, David / Dilmen, Irem / Birgonul, M. Talat (2010): The role of exogenous factors in the strategic performance of construction companies. In: Engineering, Construction and Architectural Management, v. 17, n. 2 (March 2010).
https://doi.org/10.1108/09699981011024650
-
Li, Huimin / Arditi, David / Wang, Zhuofu (2014): Transaction costs incurred by construction owners. In: Engineering, Construction and Architectural Management, v. 21, n. 4 (July 2014).
https://doi.org/10.1108/ecam-07-2013-0064
-
Damci, Atilla / Arditi, David / Polat, Gul (2013): Resource Leveling in Line-of-Balance Scheduling. In: Computer-Aided Civil and Infrastructure Engineering, v. 28, n. 9 (September 2013).
https://doi.org/10.1111/mice.12038
-
Mochtar, Krishna / Arditi, David (2001): Role of Marketing Intelligence in Making Pricing Policy in Construction. In: Journal of Management in Engineering (ASCE), v. 17, n. 3 (July 2001).
https://doi.org/10.1061/(asce)0742-597x(2001)17:3(140)
-
Arditi, David / Alavipour, S. M. Reza (2019): Trends in Expectations about Duties and Responsibilities of Construction Managers. In: Journal of Construction Engineering and Management, v. 145, n. 7 (July 2019).
https://doi.org/10.1061/(asce)co.1943-7862.0001661
-
Arditi, David / Pulket, Thaveeporn (2010): Predicting the Outcome of Construction Litigation Using an Integrated Artificial Intelligence Model. In: Journal of Computing in Civil Engineering, v. 24, n. 1 (January 2010).
https://doi.org/10.1061/(asce)0887-3801(2010)24:1(73)
-
Arditi, David / Pulket, Thaveeporn (2005): Predicting the Outcome of Construction Litigation Using Boosted Decision Trees. In: Journal of Computing in Civil Engineering, v. 19, n. 4 (October 2005).
https://doi.org/10.1061/(asce)0887-3801(2005)19:4(387)
-
Pulket, Thaveeporn / Arditi, David (2009): Universal Prediction Model for Construction Litigation. In: Journal of Computing in Civil Engineering, v. 23, n. 3 (May 2009).
https://doi.org/10.1061/(asce)0887-3801(2009)23:3(178)
-
Lee, Dong-Eun / Arditi, David (2006): Total Quality Performance of Design/Build Firms Using Quality Function Deployment. In: Journal of Construction Engineering and Management, v. 132, n. 1 (January 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:1(49)
-
Abeid, Jorge / Arditi, David (2002): Time-Lapse Digital Photography Applied to Project Management. In: Journal of Construction Engineering and Management, v. 128, n. 6 (December 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:6(530)
-
Ozorhon, Beliz / Arditi, David / Dikmen, Irem / Birgonul, M. Talat (2011): Toward a Multidimensional Performance Measure for International Joint Ventures in Construction. In: Journal of Construction Engineering and Management, v. 137, n. 6 (June 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000314
-
Lee, Dong-Eun / Lim, Tae-Kyung / Arditi, David (2012): Stochastic Project Financing Analysis System for Construction. In: Journal of Construction Engineering and Management, v. 138, n. 3 (March 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000432
-
Arditi, David / Oksay, Fatih E. / Tokdemir, Onur B. (1998): Predicting the Outcome of Construction Litigation Using Neural Networks. In: Computer-Aided Civil and Infrastructure Engineering, v. 13, n. 2 (March 1998).
https://doi.org/10.1111/0885-9507.00087
-
Lee, Dong-Eun / Arditi, David / Son, Chang-baek (2012): The probability distribution of project completion times in simulation-based scheduling. In: KSCE Journal of Civil Engineering, v. 17, n. 4 (December 2012).
https://doi.org/10.1007/s12205-013-0147-x
-
Polat, Gul / Arditi, David / Mungen, Ugur (2007): Simulation-Based Decision Support System for Economical Supply Chain Management of Rebar. In: Journal of Construction Engineering and Management, v. 133, n. 1 (January 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:1(29)
-
Arditi, David / Mochtar, Krishna (2000): Trends in productivity improvement in the US construction industry. In: Construction Management and Economics, v. 18, n. 1 (January 2000).
https://doi.org/10.1080/014461900370915
-
Arditi, David / Lee, Dong‐Eun (2004): Service quality performance of design/build contractors using quality function deployment. In: Construction Management and Economics, v. 22, n. 2 (February 2004).
https://doi.org/10.1080/0144619042000201321
-
Li, Huimin / Arditi, David / Wang, Zhuofu (2012): Transaction-related issues and construction project performance. In: Construction Management and Economics, v. 30, n. 2 (February 2012).
https://doi.org/10.1080/01446193.2012.655254
-
Al‐Sobiei, Obaid Saad / Arditi, David / Polat, Gul (2005): Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. In: Construction Management and Economics, v. 23, n. 4 (May 2005).
https://doi.org/10.1080/01446190500041578
-
Mochtar, Krishna / Arditi, David (2001): Pricing strategy in the US construction industry. In: Construction Management and Economics, v. 19, n. 4 (July 2001).
https://doi.org/10.1080/01446190010020372
-
Arditi, David / Sikangwan, Pirasak / Tokdemir, Onur B. (2002): Scheduling system for high rise building construction. In: Construction Management and Economics, v. 20, n. 4 (June 2002).
https://doi.org/10.1080/01446190210131647
-
Akan, Guzin Tarim / Arditi, David / Imre, Mehmet (1984): Priority ranking of highway improvement projects. In: Construction Management and Economics, v. 2, n. 1 (March 1984).
https://doi.org/10.1080/01446198400000005
-
Arditi, David / Akan, Guzin Tarim / Gurdamar, San (1985): Reasons for delays in public projects in Turkey. In: Construction Management and Economics, v. 3, n. 2 (September 1985).
https://doi.org/10.1080/01446198500000013
-
Arditi, David / Mochtar, Krishna (1996): Productivity improvement in the Indonesian construction industry. In: Construction Management and Economics, v. 14, n. 1 (January 1996).
https://doi.org/10.1080/01446199600000003
-
Alavipour, S. M. Reza / Arditi, David (2019): Time-cost tradeoff analysis with minimized project financing cost. In: Automation in Construction, v. 98 (February 2019).
https://doi.org/10.1016/j.autcon.2018.09.009