Advertisement

Share

Follow

Trubbachbrücke (A73)

General Information

Beginning of works: March 2014
Completion: November 2015
Status: in use

Project Type

Location

Location: , , ,
Part of:
Carries: A 73 Motorway (Germany)
Coordinates: 49° 42' 52.28" N    11° 3' 10.16" E
Show coordinates on a map

Technical Information

Dimensions

total length 95.00 m
span lengths 27.50 m - 44.00 m - 27.50 m
bridge surface 3 263 m²
deck deck depth 1.40 - 2.30 m
roadway / carriageway width 2 x 12 m
walkway width 2.5 m
piles diameter 1.20 m

Quantities

concrete volume 5 884 m³
prestressing steel 90 t
reinforcing steel 623 t
piles total length of piles 935 m

Cost

cost of construction Euro 11 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

Relevant Publications

  • Wellner, Sabine (2016): Chronik des Brückenbaus. In: 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310.
  • About this
    data sheet
  • Structure-ID
    20074919
  • Date created
    21/03/2018
  • Last Update
    21/03/2018