Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Three-span continuous girder bridge Haunched girder bridge Double T-section girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
In-situ casting on falsework |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Forchheim, Forchheim (Kreis), Bavaria, Germany |
---|---|
Part of: | |
Carries: |
A 73 Motorway (Germany)
|
Coordinates: | 49° 42' 52.28" N 11° 3' 10.16" E |
Technical Information
Dimensions
total length | 95.00 m | |
span lengths | 27.50 m - 44.00 m - 27.50 m | |
number of spans | 3 | |
bridge surface | 3 263 m² | |
deck | deck depth | 1.40 - 2.30 m |
roadway / carriageway width | 2 x 12 m | |
walkway width | 2.5 m | |
piles | diameter | 1.20 m |
Quantities
concrete volume | 5 884 m³ | |
prestressing steel | 90 t | |
reinforcing steel | 623 t | |
piles | total length of piles | 935 m |
Cost
cost of construction | Euro 11 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. In: (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310. (2016):
- About this
data sheet - Structure-ID
20074919 - Published on:
21/03/2018 - Last updated on: