Advertisement

Share

Follow

Südschnellweg Viaduct

General Information

Completion: 1960
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: , , ,
Address: Südschnellweg (B3) / Hildesheimer Straße
Coordinates: 52° 20' 34.07" N    9° 45' 52.43" E
Show coordinates on a map

Technical Information

Dimensions

total length 484 m
span lengths 22.00 m - 22.50 m - 23.50 m - 25.00 m - 27.00 m - 29.50 m - 32.50 m - 40.00 m - 56.00 m - 40.00 m - 36.00 m - 30.00 m - 25.00 m - 21.00 m - 18.00 m
bridge surface 6 760 m²
number of lanes 2 x 2
roadway / carriageway width 12.50 m
superstructure girder depth 1.95 m

Quantities

Rehabilitation
concrete volume 230 m³
prestressing steel 74 t
reinforcing steel 55 t

Design Loads

Rehabilitation
live load Brückenklasse 60/30 (DIN 1072)

Cost

Rehabilitation
cost of construction Euro 4 900 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20077336
  • Date created
    01/05/2019
  • Last Update
    01/05/2019