General Information
Completion: | 1960 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Hanover, Region Hannover, Lower Saxony, Germany |
---|---|
Address: | Südschnellweg (B3) / Hildesheimer Straße |
Coordinates: | 52° 20' 34.07" N 9° 45' 52.43" E |
Technical Information
Dimensions
total length | 484 m | |
span lengths | 22.00 m - 22.50 m - 23.50 m - 25.00 m - 27.00 m - 29.50 m - 32.50 m - 40.00 m - 56.00 m - 40.00 m - 36.00 m - 30.00 m - 25.00 m - 21.00 m - 18.00 m | |
number of spans | 15 | |
bridge surface | 6 760 m² | |
number of lanes | 2 x 2 | |
roadway / carriageway width | 12.50 m | |
superstructure | girder depth | 1.95 m |
Quantities
Rehabilitation | ||
---|---|---|
concrete volume | 230 m³ | |
prestressing steel | 74 t | |
reinforcing steel | 55 t |
Design Loads
Rehabilitation | ||
---|---|---|
live load | Brückenklasse 60/30 | |
design code(s) | DIN 1072 |
Cost
Rehabilitation | ||
---|---|---|
cost of construction | Euro 4 900 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Rehabilitation (2015-2017)
Owner
Client
Design
Structural engineering
Expertise
Checking engineering
- Reinhard Maurer (checking engineer)
Contractor
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2018. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2018, pp. 111-127.
- About this
data sheet - Structure-ID
20077336 - Published on:
01/05/2019 - Last updated on:
01/05/2019