Red Valley Viaduct

General Information

Other name(s): Talbrücke Rotes Tal
Official designation: 5321/15
Beginning of works: 2000
Completion: 2002
Duration of works: 26 months
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A71
Part of:
Coordinates: 50° 35' 43.43" N    10° 29' 50.22" E
Show coordinates on a map

Technical Information

Dimensions

width 28.5 m
total length 2 × 406.00 m
span lengths 28.00 m - 10 × 35.00 m - 28.00 m
bridge surface 2 × 5 515 m²
deck deck depth 1.80 m
deck width 2 × 14.25 m
piers height 10.0 - 19.0 m

Quantities

deck concrete volume 9 116 m³
prestressing steel 228 t
reinforcing steel 896 t
substructure concrete volume 6 208 m³
reinforcing steel 534 t

Cost

cost of construction (incl. taxes) German Mark 17 000 000

Materials

substructure reinforced concrete
deck prestressed concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002206
  • Date created
    09/11/2001
  • Last Update
    05/02/2016