General Information
Completion: | November 2014 |
---|---|
Status: | in use |
Project Type
Structure: |
Swing bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Structure: |
Cable-stayed bridge with fan system |
Material: |
Weathering steel bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Greenwich, London, England, United Kingdom |
---|---|
Coordinates: | 51° 28' 57.91" N 0° 1' 5.85" W |
Technical Information
Dimensions
main span | 44 m | |
span lengths | 8 m - 44 m | |
deck width | 4 - 5.5 m | |
number of spans | 2 |
Materials
pylon |
steel
|
---|---|
deck of main span |
weathering steel
|
abutments |
reinforced concrete
|
pier |
reinforced concrete
|
Participants
Architecture
Structural engineering
Contractor
Steel erection
Mechanical & electrical engineering
Relevant Web Sites
Relevant Publications
- (2016): The Design and Construction of Greenwich Reach Swing Bridge. Presented at: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2416-2423.
- The development of a footbridge design through the UK planning process - the Greenwich Reach Footbridge. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- About this
data sheet - Structure-ID
20071922 - Published on:
20/10/2016 - Last updated on:
31/10/2016