Črni Kal Viaduct

General Information

Beginning of works: September 2001
Completion: 23 September 2004
Status: in use

Project Type

Location

Location: , ,
Carries:
  • Avtocesta A1
Part of:
Coordinates: 45° 33' 22.34" N    13° 52' 13.90" E
Show coordinates on a map

Technical Information

Dimensions

main span 141.14 m
bridge surface 28 172 m²
Northern bridge total length 1053.50 m
span lengths 60.49 m - 120.97 m - 3 × 141.14 m - 120.97 m - 75.61 m - 60.49 m - 3 × 50.41 m - 40.33 m
piers pier height 9.0 - 87.50 m
Southern bridge total length 1056.35 m
span lengths 79.35 m - 119.03 m - 3 × 138.86 m - 119.03 m - 74.39 m - 59.51 m - 3 × 49.59 m - 39.67 m

Quantities

concrete volume 50 000 m³
prestressing steel 1 300 t
reinforcing steel 8 000 t

Cost

cost of construction Euro 20 500 000

Materials

deck prestressed concrete
piers reinforced concrete

Products, Services & Reports

Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions ...

[more]

Advertisement

Participants

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20009675
  • Date created
    26/07/2003
  • Last Update
    14/01/2018