Advertisement

Share

Follow

Abend Viaduct

General Information

Name in local language: Abendtalbrücke
Beginning of works: 2004
Completion: 2006
Duration of works: 22 months
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autobahn A38
Part of:
Coordinates: 51° 24' 0.89" N    10° 1' 29.62" E
Show coordinates on a map

Technical Information

Dimensions

width 29.06 m
length 199 m
span lengths 29.00 m - 3 × 47.00 m - 29.00 m
height above valley floor or water 24 m
girder depth 2.30 m

Cost

cost of construction (incl. taxes) Euro 5 700 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20020183
  • Date created
    21/03/2006
  • Last Update
    12/07/2017