0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1959
Completion: 17. November 1963
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Sill Valley
Part of:
Coordinates: 47° 12' 7.22" N    11° 24' 6.56" E
Show coordinates on a map

Technical Information

Dimensions

height 190 m
total length 820.0 m
span lengths 81.0 m - 108.0 m - 198.0 m - 108.0 m - 2 x 81.0 m
number of spans 6
deck deck depth max. 7.70 m
main bridge
length 657 m
Initial construction
deck deck width 22.200 m
number of lanes 2 x 2
Widening
deck deck width 24.60 m
number of lanes 2 x 3

Quantities

structural steel 6 000 m³
concrete volume 70 000 m³
prestressing steel 60 t
reinforcing steel 1 400 t

Cost

cost of construction Austrian Shilling 196 586 647.00

Materials

piers reinforced concrete
deck of main bridge steel
deck of approach viaducts prestressed concrete

Case Studies and Applied Products

TENSA®FINGER GF – Sliding Finger joints

TENSA®FINGER GF – Sliding Finger joints

The mageba GF Sliding Finger Construction is a robust Finger Expansion Joint for high requirements with regard to moveability (up to 1,000 mm), riding comfort and durability.

[more]

Notes

22 people lost their lives during construction including bridge engineers Herbert Henning, Hermann Staf and Hans Gaidoschik.

Participants

Initial construction (1959-1963)
Owner
Design
Co-contractor
Expansion joint replacement (2003)
Expansion joints

Relevant Web Sites

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20000657
  • Published on:
    08/04/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine