Advertisement

Share

Follow

Vermessungstechnische Lösungen auf den Baustellen North Downs Tunnel und Brücke Medway Crossing – Hochgeschwindigkeitstrasse von London zum Eurotunnel

Author(s):

Medium: journal article
Language(s): de 
Published in: Bauingenieur, , n. 6, v. 79
Abstract:

This paper explains that the application of modern measurement technology becomes more and more important in tunnelling and bridge construction. New sensors increase the accuracy and reduce conventional staff intensive measuring concepts. The interaction of planning, basis measurement and the building concurrent measurements is currently decisive for smooth operation during these engineering projects.

Structures and Projects

Advertisement

  • About this
    data sheet
  • Reference-ID
    10015467
  • Date created
    21/07/2004
  • Last Update
    14/08/2014