0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Te Wero Bridge
Beginning of works: January 2011
Completion: August 2011
Status: in use

Project Type

Location

Location: , ,
Coordinates: 36° 50' 28.68" S    174° 45' 35.71" E
Show coordinates on a map

Technical Information

Dimensions

total length 100 m
length of movable section 44 m
horizontal navigation clearance 36 m
bascule span span lengths 2 x 22 m
number of spans 2
pylons number 2

Materials

deck steel
pylons steel

Participants

Design
Structural engineering

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074136
  • Published on:
    03/11/2017
  • Last updated on:
    02/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine