General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Three-span continuous girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Würenlos, Argovia, Switzerland |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 47° 26' 5.90" N 8° 21' 15.58" E |
Technical Information
Dimensions
main span | 60.00 m | |
deck depth | 2.50 m | |
span lengths | 54.00 m - 60.00 m - 54.00 m | |
number of spans | 3 | |
on-center distance between girders | 7.35 m | |
total width | 30.00 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Initial construction (1967-1970)
Owner
Design
- Christian Menn (designer)
Renovation (2007)
Expansion joints
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Christian Menn - Brücken / Bridges. Scheidegger & Spiess, Zurich (Switzerland), pp. 170-177. (2015):
- About this
data sheet - Structure-ID
20026159 - Published on:
15/02/2007 - Last updated on:
05/02/2016