0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Wittenberge Motorway Bridge (A 14)

General Information

Name in local language: Elbebrücke Wittenberge
Completion: 2024
Status: under construction

Project Type

Location

Location: , , ,
, , ,
Crosses:
  • Elbe River
Part of:
Next to: Wittenberge Road Bridge (B 189) (1978)
Coordinates: 52° 59' 9.63" N    11° 43' 28.01" E
Show coordinates on a map

Technical Information

Dimensions

main span 160 m
width 32 m
total length 1 110.5 m
main bridge
total length 432 m
span lengths 126 m - 160 m - 126 m

Cost

cost of construction Euro 170 000 000

Materials

piers reinforced concrete
deck of main bridge composite steel-reinforced concrete
deck of approach viaduct prestressed concrete
abutments reinforced concrete

Case Studies and Applied Products

A New Major Bridge over the Elbe River

A New Major Bridge over the Elbe River

Nuremberg-based K+S Ingenieur-Consult GmbH & Co. KG, a subsidiary of SRP Schneider & Partner Ingenieur Consult GmbH, Kronach, is planning the large new Elbe bridge as part of the new construction of the A14 Magdeburg-Schwerin mot ... [more]

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043633
  • Published on:
    17/02/2009
  • Last updated on:
    10/11/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine