General Information
Other name(s): | Central Valley Greenway Bridge |
---|---|
Beginning of works: | 2007 |
Completion: | June 2009 |
Status: | in use |
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Bicycle and pedestrian bridge |
Structure: |
Warren type truss bridge |
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Burnaby, British Columbia, Canada |
---|---|
Address: | Winston Street |
Coordinates: | 49° 15' 28.84" N 122° 57' 52.69" W |
Technical Information
Dimensions
total length | 247 m | |
span lengths | 12 m - 15 m - 2 x 30 m - 2 x 27 m - 18 m | |
number of spans | 7 | |
deck | length | 159 m |
Materials
piers |
steel
reinforced concrete |
---|---|
truss |
steel
|
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and Construction of Urban Footbridges in Canada. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- A Tale of Two Footbridges – Proof That a Redesign Can Still Achieve Signature Status at An Affordable Cost. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- About this
data sheet - Structure-ID
20072278 - Published on:
08/12/2016 - Last updated on:
04/01/2017