General Information
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Two-span cable-stayed bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Construction method: |
deck: Incremental launching with auxiliary supports |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2013 |
for registered users |
---|---|
1993 |
for registered users |
Location
Location: |
Wandre, Liège, Liège, Wallonia, Belgium Herstal, Liège, Wallonia, Belgium |
---|---|
Crosses: |
|
Part of: |
|
Replaces: |
Esperanto Bridge (1948)
Wandre Bridge (1948) |
Coordinates: | 50° 40' 25" N 5° 38' 38" E |
Technical Information
Dimensions
total length | 527.09 m | |
main spans | 144.00 m - 168.00 m | |
span lengths | 18 m - 40 m - 29 m - 29 m - 144 m - 30 m - 168 m - 66 m | |
number of cables | 38 | |
suspended length | 411.00 m | |
number of spans | 7 | |
deck | deck depth | 3.42 m |
deck width | 21.80 - 22.10 m | |
pylon | pylon height | 95.50 m |
Cost
cost of construction | Belgian franc 508 000 000 |
Materials
cables |
steel wire
|
---|---|
pylon |
reinforced concrete
|
deck |
prestressed concrete
|
Excerpt from Wikipedia
The Pont de Wandre is a single-pier cable-stayed bridge carrying the N667 road across the Albert Canal and River Meuse between Liège (on the east side) and Herstal (on the west side), both in Belgium.
History and description
From the 15th to 19th century the Meuse at Wandre was crossed by a ferry. In 1884 the first bridge crossing between Herstal and Wandre was built; it consisted of a metal bowstring bridge across the canal, a seven-arched brick-and-stone viaduct across the land between the two waterways, then a box-section rectangular girder truss bridge across the Meuse supported on three piers. Due to increased traffic caused by industrial development, a second bridge was built upstream of the first between 1935 and 1937; this was blown up by the Belgian Army in 1940. Two temporary metal pedestrian bridges of metal replaced the destroyed bridge.
Construction of replacement bridges began in 1947; a 59.4-metre-long (195 ft) bridge across the Albert Canal (le pont de l'Esparanto), and a three-span concrete bridge across the Meuse of total length 190 m; the new construction was officially opened in 1948.
An increase in traffic on the Albert Canal during the 1970s necessitated ist expansion for larger vessels, requiring the widening of the channel from 35 to 85 m; as a result this expansion also required the construction of a new bridge.
Work to construct a new bridge to replace the postwar bridges began in 1985; the bridge was officially opened 16 June 1989, at a cost of 508 million belgian francs. It connects suburbs Wandre and Herstal of Liege, crossing the Meuse and Albert Canals, the main support stands on the isthmus between the Meuse and Albert canal.
The total length of the bridge, including the approach sections, is c. 527 m; the main cable-stayed spans are 144 m and 168 m. The inverted Y-shaped concrete main support is 88.5 m high, and supports a 22-metre-wide (72 ft) road deck.
Text imported from Wikipedia article "Pont de Wandre" and modified on July 22, 2019 according to the CC-BY-SA 4.0 International license.
Participants
-
Bureau d'études Greisch
- René Greisch (designer)
Relevant Web Sites
Relevant Publications
- Bridge engineering. A global perspective. Thomas Telford, London (United Kingdom), ISBN 9780727732156, pp. 633, 637. (2003):
- Bridges - Ponts - Brücken. Atrium, Mexico City (Mexico), pp. 372-379. (2002):
- La modernisation du canal Albert en Région Wallonne. brochure, Francis Hambye, Namur (Belgium), 2000.
- New Bridges. Arco Editorial, S. A., pp. 88-101. :
- Le Passage. 1st edition, Everest Communication, Luxembourg (Luxembourg), pp. 46-47. (1999):
- About this
data sheet - Structure-ID
20000101 - Published on:
08/03/1999 - Last updated on:
25/07/2018