General Information
Status: | in use |
---|
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wroclaw, Lower Silesian Voivodeship, Poland |
---|---|
Coordinates: | 51° 7' 22.55" N 16° 55' 54.92" E |
Technical Information
Dimensions
total length | 318.89 m | |
span lengths | 30.00 m - 40.00 m - 50.00 m - 60.00 m - 57.00 m - 34.00 m - 29.00 m | |
number of spans | 7 | |
total width | 36.16 m | |
deck | deck width | 2 x 17.18 m |
piles | diameter | 1.50 m |
Quantities
concrete volume | 6 685.5 m³ | |
prestressing steel | 746.0 t | |
reinforcing steel | 2 382.0 t |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction of Long Viaducts with the Use of Various Technologies. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20062071 - Published on:
10/10/2011 - Last updated on:
05/02/2016