Construction of Long Viaducts with the Use of Various Technologies
Author(s): |
Jerzy Onysyk
Przemyslaw Prabucki Krzysztof Sadowski Jan Biliszczuk Mariusz Sulkowski |
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011 |
Published in: | IABSE-IASS 2011 London Symposium Report |
Year: | 2011 |
Abstract: |
Transport infrastructure in Poland is currently being dynamically developed and modernized. Specifically, construction of new sections of motorways and city ring roads should be emphasized. These newly built structures meet modern European standards. A salient example of these large scale construction works is A8 Motorway Ring Road of Wrocław, being part of Wrocław’s preparations for 2012 UEFA European Football Championship. Two long prestressed concrete box viaducts (300 m and 750 m), with spans from 40,0 m to 60,0 m, included in the ring road, are presented in this paper. The structures are similar in form but differ both in terms of architectural features as well as in applied construction technologies, discussed and compared herein. The paper presents technological assumptions and conclusions drawn from the comparison of the technologies. |
Keywords: |
construction comparison construction technology Multi-span prestressed concrete box viaducts
|