0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2000
Completion: 2004
Status: in use

Project Type

Location

Location: , , ,
Part of:
Connects to: Votonosi Tunnel
Coordinates: 39° 45' 25" N    21° 7' 31" E
Show coordinates on a map

Technical Information

Dimensions

total length 490 m
span lengths 130 m - 230 m - 130 m
number of spans 3
deck deck depth 5.50 - 13.50 m
deck width 13.50 m
piers height max. 55 m

Quantities

concrete volume 35 000 m³
prestressing steel 1 200 t
reinforcing steel 5 942 t

Cost

cost of construction Euro 18 700 000

Materials

deck prestressed concrete
piers reinforced concrete

Chronology

2000

Beginning of construction.

August 2004

End of structural works.

May 2005

Expected opening of traffic.

Participants

Owner
Design
Structural engineering
Main contractor
Prestressing

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002432
  • Published on:
    30/11/2001
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine