General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Vierendeel truss bridge |
Material: |
Steel-composite material bridge |
Support conditions: |
for registered users |
Structure: |
Pony truss bridge |
Location
Location: |
Vilafant, Girona, Catalonia, Spain |
---|---|
Crosses: |
High-speed rail line Madrid-Zaragoza-Barcelona-French Border (2008)
|
Coordinates: | 42° 15' 12.79" N 2° 56' 50.81" E |
Coordinates: | 42° 15' 18.31" N 2° 56' 48.58" E |
Technical Information
Dimensions
total length | 48.80 m | |
span | 45.2 m | |
deck | width | 4 m |
truss | height | 1.2 - 3.4 m |
Cost
cost of construction | ca. Euro 2 x 2 500 000 | |
cost of construction per m² | ca. Euro 8 500 |
Materials
deck |
glass-fiber-reinforced polymer (GFRP)
|
---|---|
abutments |
reinforced concrete
|
webs |
glass-fiber-reinforced polymer (GFRP)
|
Vierendeel truss |
stainless steel
|
Participants
Design
-
Pedelta Structural Engineers
- Juan A. Sobrino (designer)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and Construction of Hybrid Steel and GFRP Footbridges. Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- Hybrid steel and GFRP footbridges. Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Light and Durable Steel-GFRP Pedestrian Bridges. Presented at: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- About this
data sheet - Structure-ID
20062039 - Published on:
09/10/2011 - Last updated on:
23/10/2016