General Information
Completion: | 2017 |
---|---|
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
main bridge: Tied-arch bridge with inclined hangers |
Construction method: |
main bridge: Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! approach viaduct: Reinforced concrete bridge |
Construction method: |
approach viaduct: Precast girders with cast-in-situ slab |
Structure: |
approach viaduct: Quadruple T-section girder bridge |
Material: |
southern approach viaduct: Steel-reinforced concrete composite bridge |
Structure: |
southern approach viaduct: Twin girder bridge southern approach viaduct: Haunched girder bridge |
Construction method: |
southern approach viaduct: Longitudinal launching |
Location
Location: |
Lattes, Hérault (34), Occitanie, France |
---|---|
Crosses: |
|
Part of: |
|
Coordinates: | 43° 35' 16.82" N 3° 54' 26.59" E |
Technical Information
Dimensions
total length | 576.4 m | |
bridge surface | 7 800 m² | |
number of tracks | 2 | |
abutments | number | 2 |
piers | number | 15 |
piles | diameter | 1.2 m |
length | 25 - 30 m | |
number | 194 | |
precast elements (RC) | number | 44 |
approach viaduct PC12-PC15 | ||
---|---|---|
span lengths | 28.5 m - 31.4 m - 21 m | |
approach viaduct PC4-PC6 | ||
span lengths | 2 x 28 m | |
number of spans | 2 | |
approach viaduct PC6-PC9 | ||
span lengths | 3 x 28 m | |
number of spans | 3 | |
approach viaduct PC9-PC12 | ||
span lengths | 3 x 28.5 m | |
number of spans | 3 | |
main bridge PC15-C16 | ||
rise | 17.5 m | |
span | 90 m | |
southern approach viaduct C0-PC4 | ||
total length | 180 m | |
span lengths | 39 m - 2 x 51 m - 39 m | |
on-center distance between girders | 7.87 m | |
girder depth | 2.65 - 3.50 m |
Quantities
concrete volume | 15 000 m³ | |
reinforcing steel | 2 600 t | |
main bridge PC15-C16 | ||
---|---|---|
structural steel | 1 600 t | |
southern approach viaduct C0-PC4 | ||
structural steel | 800 t |
Design Loads
design speed | 350 km/h |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les ouvrages d'art de la LGV CNM. In: Travaux, n. 940 (March 2018), pp. 64-73. (2018):
- Le viaduc du Lez et de la Lironde. In: Travaux, n. 912 (January 2015), pp. 120-125. (2015):
- About this
data sheet - Structure-ID
20072648 - Published on:
01/03/2017 - Last updated on:
25/09/2018