General Information
Official designation: | VIA 1104 |
---|---|
Beginning of works: | March 2012 |
Completion: | August 2014 |
Duration of works: | 17 months |
Status: | completed |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Twin girder bridge |
Construction method: |
Longitudinal launching |
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Haunched girder bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Changé, Mayenne (53), Pays de la Loire, France |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 48° 6' 53.36" N 0° 46' 15.50" W |
Technical Information
Dimensions
length | 222 m | |
span lengths | 56 m - 68 m - 56 m - 42 m | |
number of spans | 4 | |
abutments | number | 2 |
deck | width | 12.34 m |
girder depth | 3.50 - 5.00 m | |
number of longitudinal girders | 2 | |
piers | number | 3 |
Quantities
structural steel | 1 030 t | |
concrete volume | 3 400 m³ | |
reinforcing steel | 650 t | |
sheet piling | 538 m² | |
piles | total length of piles | 180 m |
Design Loads
design speed | 350 km/h |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Conceding authority
Owner
Architecture
- Jean-Pierre Duval (architect)
-
Architecture NEEL
- Fabrice Néel (architect)
Contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les ouvrages d'art de la LGV BPL. In: Travaux, n. 912 (January 2015), pp. 82-88. (2015):
- About this
data sheet - Structure-ID
20070833 - Published on:
04/03/2016 - Last updated on:
04/03/2016