General Information
Project Type
Structure: |
Twin girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Haunched girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Bessines-sur-Gartempe, Haute-Vienne (87), Nouvelle-Aquitaine, France |
---|---|
Address: | A20 |
Carries: |
|
Part of: | |
Coordinates: | 46° 6' 55" N 1° 22' 32" E |
Technical Information
Dimensions
total length | 240.03 m | |
span lengths | 57.15 m - 102.87 m - 80.01 m | |
number of spans | 3 | |
pier height | 21 - 23 m | |
girder depth | 3.50 - 4.75 m | |
deck | deck width | 20.60 m |
deck slab thickness | 22 cm |
Quantities
structural steel | 1 565 t | |
concrete volume | 2 950 m³ | |
reinforcing steel | 450 t |
Cost
cost of construction | French Franc 46 000 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
cross beams |
steel
|
girders |
steel
|
Participants
Owner
Client
Design
Architecture
- Berdj Mikaelian (architect)
Structural engineering
- CCED (steel)
- SEAMP Toulouse
- Société d'études R. Foucault et Associés (steel)
Checking engineering
Civil works
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Autoroute A20. la section Bessines - Razès en Haute-Vienne. In: Travaux, n. 693 (December 1993), pp. 59-63. (1993):
- About this
data sheet - Structure-ID
20007923 - Published on:
29/01/2003 - Last updated on:
05/02/2016