Official designation: | VIA 0255 |
---|---|
Beginning of works: | December 2012 |
Completion: | January 2014 |
Duration of works: | 18 months |
Status: | completed |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Construction method: |
Longitudinal launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
La Bazoge, Sarthe (72), Pays de la Loire, France La Milesse, Sarthe (72), Pays de la Loire, France |
---|---|
Part of: | |
Coordinates: | 48° 4' 46.86" N 0° 9' 1.04" E |
Technical Information
Dimensions
width | 12.64 m | |
total length | 374 m | |
span lengths | 37 m - 6 x 50 m - 37 m | |
number of spans | 8 | |
girder depth | 3.25 m | |
piers | number | 7 |
Quantities
structural steel | 1 113 t | |
concrete volume | 7 010 m³ | |
reinforcing steel | 1 106 t | |
sheet piling | 2 205 m² | |
total length of piles | 968 m |
Design Loads
design speed | 350 km/h |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
bottom flange |
reinforced concrete
|
girders |
steel
|
Participants
Conceding authority
Owner
Architecture
- Jean-Pierre Duval (architect)
-
Architecture NEEL
- Fabrice Néel (architect)
Contractor
Steel construction
Bearings
Relevant Web Sites
Relevant Publications
- Les ouvrages d'art de la LGV BPL. In: Travaux, n. 912 (January 2015), pp. 82-88. (2015):
- About this
data sheet - Structure-ID
20070828 - Published on:
04/03/2016 - Last updated on:
04/03/2016