0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Neckartalviadukt Untertürkheim
Beginning of works: 1989
Completion: 1994
Status: in use

Project Type

Location

Location: , , ,
Address: B14
Crosses:
  • Neckar River
Coordinates: 48° 47' 26.58" N    9° 14' 35.85" E
Coordinates: 48° 47' 8.35" N    9° 13' 51.64" E
Coordinates: 48° 47' 5.94" N    9° 13' 56.94" E
Coordinates: 48° 47' 19.82" N    9° 14' 14.66" E
Show coordinates on a map

Technical Information

Dimensions

Hochbrücke Güterbahnhof
main span 135 m
height 20 m
total length 450 m
number of lanes 2 x 3
Hochstraßenbrücke
main span 66 m
height 12 m
total length 850 m

Quantities

Hochbrücke Güterbahnhof
concrete volume 28 000 m³
prestressing steel 1 000 t
reinforcing steel 3 000 t
formwork 50 000 m²

Cost

Hochbrücke Güterbahnhof
cost of construction German Mark 40 000 000
Hochstraßenbrücke
cost of construction German Mark 76 000 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086493
  • Published on:
    13/08/2023
  • Last updated on:
    13/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine