General Information
Name in local language: | Neckartalviadukt Untertürkheim |
---|---|
Beginning of works: | 1989 |
Completion: | 1994 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Construction method: |
Balanced cantilever method Incremental launching Span-by-span in-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Untertürkheim, Stuttgart, Baden-Württemberg, Germany |
---|---|
Address: | B14 |
Crosses: |
|
Coordinates: | 48° 47' 26.58" N 9° 14' 35.85" E |
Coordinates: | 48° 47' 8.35" N 9° 13' 51.64" E |
Coordinates: | 48° 47' 5.94" N 9° 13' 56.94" E |
Coordinates: | 48° 47' 19.82" N 9° 14' 14.66" E |
Technical Information
Dimensions
Hochbrücke Güterbahnhof | ||
---|---|---|
main span | 135 m | |
height | 20 m | |
total length | 450 m | |
number of lanes | 2 x 3 | |
Hochstraßenbrücke | ||
main span | 66 m | |
height | 12 m | |
total length | 850 m |
Quantities
Hochbrücke Güterbahnhof | ||
---|---|---|
concrete volume | 28 000 m³ | |
prestressing steel | 1 000 t | |
reinforcing steel | 3 000 t | |
formwork | 50 000 m² |
Cost
Hochbrücke Güterbahnhof | ||
---|---|---|
cost of construction | German Mark 40 000 000 | |
Hochstraßenbrücke | ||
cost of construction | German Mark 76 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20086493 - Published on:
13/08/2023 - Last updated on:
13/08/2023