General Information
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Moutier, Berne, Switzerland |
---|---|
Address: | A16 |
Part of: | |
Coordinates: | 47° 16' 29.10" N 7° 23' 20.30" E |
Coordinates: | 47° 16' 9.53" N 7° 22' 33.16" E |
Technical Information
Dimensions
length | 2 x 1 190 m | |
tunnel section area | 108 m² |
Chronology
25 November 2011 | Opened to traffic |
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Due nuovi passi avanti per la Transjurane. In: Strade e Autostrade, v. 16, n. 91 (January 2012), pp. 16. (2012):
- La Transjurane. In: Strade e Autostrade, v. 9, n. 53 (September 2005), pp. 34-51. (2005):
- Die Verteilung des geologischen Risikos bei TBM-Varianten am Beispiel Tunnel Moutier im Schweizer Jura. In: Felsbau, v. 25, n. 5 ( 2007), pp. 172. (2007):
- About this
data sheet - Structure-ID
20007102 - Published on:
04/12/2002 - Last updated on:
28/05/2021