0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Rambler Channel Rail Bridge
Beginning of works: February 1995
Completion: June 1997
Status: in use

Project Type

Location

Location: , , ,
Part of:
Coordinates: 22° 21' 23.24" N    114° 6' 48.75" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 100 m
bridge surface 23 140 m²
span lengths of main bridge 5 x 121 m - 2 × 90 m - 60 m
main bridge
length 850 m

Quantities

concrete volume 48 300 m³
prestressing steel 930 t
reinforcing steel 8 600 t
number of precast segments 701

Materials

deck precast prestressed concrete

Chronology

September 1994

Start of design.

February 1995

Construction begins.

June 1997

Delivery

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007712
  • Published on:
    10/01/2003
  • Last updated on:
    11/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine