General Information
Name in local language: | Talbrücke Truckenthal; Truckenthalbrücke |
---|---|
Beginning of works: | 2007 |
Completion: | 2011 |
Status: | in use |
Project Type
Function / usage: |
High-speed rail bridge |
---|---|
Structure: |
Deck arch bridge |
Construction method: |
deck: Incremental launching |
Material: |
deck: Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! arch: Reinforced concrete bridge |
Location
Location: |
Schalkau, Sonneberg (Kreis), Thuringia, Germany |
---|---|
Part of: |
|
Coordinates: | 50° 25' 14.13" N 11° 1' 20.36" E |
Technical Information
Dimensions
length | 425 m | |
height above valley floor or water | 57 m | |
arch | rise | 37.8 m |
span | 161 m | |
depth | 3.6 m | |
deck | span lengths | 3 x 44 m - 7 x 23 m - 3 x 44 m |
number of spans | 13 | |
girder depth | 4.425 m | |
deck slab width | 13.3 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
arch |
reinforced concrete
|
abutments |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Chronology
10 December 2017 | Opened to traffic along with the entire high-speed rail line from Nuremberg to Erfurt. |
---|
Participants
Owner
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20030893 - Published on:
04/09/2007 - Last updated on:
18/01/2018