General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Structure: |
Trough / U-shaped retaining structure |
Location
Location: |
Hanover, Region Hannover, Lower Saxony, Germany |
---|---|
Address: | Messeschnellweg (B3) / Hans-Böckler-Allee (L384) |
For: |
|
Coordinates: | 52° 22' 16.73" N 9° 46' 41.88" E |
Technical Information
Dimensions
width | 22.00 m | |
total length | 454.50 m | |
trough | length | 384.50 m |
tunnel | length | 70.00 m |
Quantities
concrete volume | 34 000.00 m³ | |
reinforcing steel | 2 500.00 t | |
excavated material | 100 000.00 m³ |
Cost
cost of construction | German Mark 61 000 000 |
Materials
tunnel structure |
reinforced concrete
|
---|---|
trough |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Checking engineering
- Reiner Nolting (checking engineer)
Co-contractor
- Fritz Schuppert GmbH & Co. KG
- Mehmel GmbH
- Mölders Betonbau und Instandsetzungs GmbH
- Wilhelm Wallbrecht GmbH & Co. KG
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 1999. Verkehrsblatt-Verlag, Dortmund (Germany), 1999, pp. 142.
- About this
data sheet - Structure-ID
20009922 - Published on:
08/08/2003 - Last updated on:
06/05/2016