General Information
Completion: | 1998 |
---|---|
Status: | in use |
Project Type
Structure: |
Immersed tube tunnel |
---|---|
Function / usage: |
Metro tunnel / subway tunnel |
Location
Location: |
Paris (12th), Paris, Ile-de-France, France Paris (13th), Paris, Ile-de-France, France |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 48° 49' 54.86" N 2° 22' 55.95" E |
Technical Information
Dimensions
tunnel unit width | 9.18 m | |
tunnel unit height | 6.30 m | |
number of tunnel units | 4 | |
tunnel unit length | 33.80 m |
Quantities
concrete volume | 3 000 m³ | |
submerged concrete volume | 6 000 m³ |
Materials
tunnel structure |
precast prestressed concrete
|
---|
Participants
Owner
Client
Main contractor
Co-contractor
- Bachy
- Bilfinger Berger SE
- Fougerolle
- Intrafor
- Muller Travaux Publics
- Société de Travaux Batignolles Savoie
- Spie Citra
- Spie Fondations
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'opération Météor. I - Le tronçon Bastille-Madeleine. In: Travaux, n. 720 (May 1996), pp. 42-49. (1996):
- La traversée sous-fluviale de la ligne Météor entre le 12ème et le 13ème arrondissement de Paris. Presented at: AFTES - Journées d'études, Chambéry, 1996, pp. 371-378. (1996):
- About this
data sheet - Structure-ID
20008889 - Published on:
26/03/2003 - Last updated on:
23/07/2014