0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2014
Completion: 17 March 2020
Status: in use

Project Type

Location

Location:
Part of:
Coordinates: 4° 55' 17.85" N    115° 1' 15.73" E
Coordinates: 4° 53' 24.01" N    115° 4' 46.23" E
Coordinates: 4° 50' 52" N    115° 6' 44.58" E
Coordinates: 4° 52' 51.01" N    115° 5' 20.48" E
Show coordinates on a map

Technical Information

Dimensions

Eastern bridge
total length 8.1 km
standard span lengths 50 m
deck girder depth 3.0 m
Western bridge
total length 5.3 km
standard span lengths 50 m
deck girder depth 3.0 m

Materials

deck precast prestressed concrete
piers reinforced concrete
piles reinforced concrete
pile caps reinforced concrete

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20071793
  • Published on:
    13/10/2016
  • Last updated on:
    05/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine