General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Construction method: |
Precast segmental construction |
Structure: |
Single-cell box girder bridge Multi-span continuous girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Brunei |
---|---|
Part of: | |
Coordinates: | 4° 55' 17.85" N 115° 1' 15.73" E |
Coordinates: | 4° 53' 24.01" N 115° 4' 46.23" E |
Coordinates: | 4° 50' 52" N 115° 6' 44.58" E |
Coordinates: | 4° 52' 51.01" N 115° 5' 20.48" E |
Technical Information
Dimensions
Eastern bridge | ||
---|---|---|
total length | 8.1 km | |
standard span lengths | 50 m | |
deck | girder depth | 3.0 m |
Western bridge | ||
total length | 5.3 km | |
standard span lengths | 50 m | |
deck | girder depth | 3.0 m |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
piles |
reinforced concrete
|
pile caps |
reinforced concrete
|
Participants
Owner
Main contractor
Relevant Web Sites
Relevant Publications
- (2015): Temburong Bridge, Brunei – CC2 Marine Viaducts in Brunei Bay. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 2038-2045.
- About this
data sheet - Structure-ID
20071793 - Published on:
13/10/2016 - Last updated on:
05/05/2024