0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Taylor Yard Bikeway and Pedestrian Bridge

General Information

Beginning of works: May 2019
Completion: March 2022
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 34° 5' 38.16" N    118° 14' 9.07" W
Show coordinates on a map

Technical Information

Dimensions

number of spans 2
abutments number 2
pier number 1

Materials

truss steel
abutments reinforced concrete
pier reinforced concrete

Participants

Owner
Architecture
Structural engineering

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20088984
  • Published on:
    09/07/2024
  • Last updated on:
    09/07/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine